Lapointe Industrial
A 70,805 ft² envelope renewal with new insulation, cladding, windows and doors to cut operating costs.
The exterior insulation, cladding, windows and doors were replaced, improving the envelope and lowering energy costs. Further phases on the site have been discussed.
- Status
- Completed
- Period
- 2023–2024
- Location
- Sudbury, Ontario
- Sector
- Industrial
- Structure
- Steel
- Scale
- 2 storeys
- Floor area
- 70,805 ft²
- Client
- Bloomington Developments
- DAO services
- Record drawings
- 3D scans
- Building permit
Project team and credits
- StructuralMakami Group


