Cambrian Heights
A 46,500 ft² multi-tenant industrial building in mass timber, placed on a difficult site using DAO's own cost and site models.
We design with glulam, cross-laminated timber (CLT) and nail-laminated timber (NLT), and we have built it: two mass timber industrial buildings in Sudbury, with a third in design.
Industrial buildings are usually steel. The Canadian Wood Council features our timber industrial work in Exploring the Role of Mass Timber in Industrial Buildings and Warehouse Construction.
A timber structure sets the column grid, beam depths, connections, fire separations and service routes. We settle these at concept stage, with the timber supplier and engineers involved.
Nordic has been the mass timber partner on our industrial work. We also use cost models to compare grids, storey heights and building sizes before the structure is fixed.
We leave timber exposed where we can. In our industrial buildings the glulam frame runs through the warehouse and the offices as the finished surface.
It depends on the building, the market and the schedule. Cambrian Heights switched from steel to timber because of the steel market. We price both early.
Glulam (glue-laminated timber) is used mainly for beams and columns. CLT (cross-laminated timber) is layered panels for floors, roofs and walls. NLT (nail-laminated timber) is dimension lumber nailed into solid panels, as in the Nepahwin balcony.
Yes. Webbwood Industrial adds a timber warehouse and canopy to a steel building, and our Lantern Box framework and the Nepahwin 2.0 study look at timber additions above existing homes.

A 46,500 ft² multi-tenant industrial building in mass timber, placed on a difficult site using DAO's own cost and site models.

A renovated 21,500 ft² building and a new 18,800 ft² mass timber building on a constrained site between two highways.

A nail-laminated timber balcony, solarium tea room and garage workshop added to a lakeside home over a phased, owner-built schedule.

A mass timber warehouse addition and wrap-around timber canopy that give an existing building a presence on the arterial road.

A mass timber A-frame hangar proposed for a 10-month design-and-build deadline using overlapping approvals and fabrication.

A two-storey mass timber vertical addition over an occupied house, studied as a model for adding homes without new land.

A rule-based mass timber addition threaded through existing downtown buildings, with drawings, fabrication data and costs generated from a few client controls.
Email [email protected]. We work from Sudbury and Ottawa across Ontario.