
Glamour by Krystal Beauty
A 4,200 ft² salon and spa fit-up, designed and approved on a fast track to open in under six months.
Retail stores, salons, spas, offices and specialised buildings. Commercial clients usually have an opening date or lease to meet, so we plan approvals and construction around it.
Before you sign, ideally. A short review of the layout, services and code requirements shows what the fit-up involves and how long approvals may take.
Often, yes. Reusing existing walls and structure, phasing the work and running approvals alongside design all shorten the schedule. That's how Krystal Beauty opened in under six months.
Yes, as part of the architectural scope on commercial projects, as at Krystal Beauty and Float Spa.

A 4,200 ft² salon and spa fit-up, designed and approved on a fast track to open in under six months.

A sensory-deprivation spa planned as a gradual removal of stimuli, with a perforated screen wall designed and built by DAO.

A mass timber A-frame hangar proposed for a 10-month design-and-build deadline using overlapping approvals and fabrication.

A second-storey office cantilevered in two directions over an existing warehouse, with rooftop equipment hidden in a new roof form.

Retrofit of an existing mall storefront to the brand's international design standards.
Email [email protected]. We work from Sudbury and Ottawa across Ontario.