Helicopter Hangar
A mass timber A-frame hangar proposed for a 10-month design-and-build deadline using overlapping approvals and fabrication.
Our response to a York Regional Police request for proposals to design and build a helicopter hangar. To meet the 10-month deadline, the proposal overlapped approvals with mass timber fabrication. An A-frame structure kept the building simple and left room for maintenance, with offices overlooking the double-height maintenance floor and a site laid out for helicopter manoeuvring.
The proposal did not go to construction.
- Status
- Proposal (not built)
- Period
- 2024
- Location
- York Region, Ontario
- Sector
- Commercial
- Structure
- Mass timber
- Scale
- 2 storeys
- Floor area
- 5,000 ft²
- Client
- York Regional Police (RFP)
- DAO services
- Conceptual design
- Rendering package
Project team and credits
- StructuralAnthony Spick; Nordic
- Mechanical and electricalKomri
- InteriorHEIA Studio
- CivilRA Engineering
- EnergyEcovert
- CodeCHM
- SpecificationsGlobal Specification
- CostHanscomb
- AviationLaamanen


